An investigation was conducted to obtain measurements of radiation levels inside the hemispherical heads of the 1-B heat exchanger. The radiation levels were measured at the handholes on two occasions with an interval of 640 hrs between them. A very large increase was noted and could be explained only by the possibility that the measurement survey points were not identical. (J.R.D.
Analytical shielding work performed for the fast reactor program during the months of July and Augus...
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
A test was performed to determine the radiation levels of the thermal barriers contained in the rod-...
A periodic survey was conducted to determine changes in radiation level in the hairpin loops resulti...
The effect of isolation and forced draining on the radiation level of the 1AC coolant purification h...
A detailed radiation survey of the Shippingport Reactor vessel head was made, and the magnitude of t...
A test was conducted to determine the radiation level of several scram shaft assemblies after their ...
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was perform...
Radiation levels were determined at all permanently installed monitored points in the disposal area....
The purpose of the survey was to determine the radiation level in the Turbine Generator Services Bui...
The results are presented of a survey of calculated gamma-ray levels at many points on the surface o...
A test was made to obtain a record of radiation contamination levels during core I seed 1 refueling ...
A study of the radiation leakage from the shield of the Virginia Polytechnic Institute UTR-10 reacto...
[[abstract]]After 37 years of operation with a total thermal output of 44,456,058 kW hr, the radiati...
The purpose of the survey was to determine the radiation levels in the 1 D Boiler Chamber during pla...
Analytical shielding work performed for the fast reactor program during the months of July and Augus...
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
A test was performed to determine the radiation levels of the thermal barriers contained in the rod-...
A periodic survey was conducted to determine changes in radiation level in the hairpin loops resulti...
The effect of isolation and forced draining on the radiation level of the 1AC coolant purification h...
A detailed radiation survey of the Shippingport Reactor vessel head was made, and the magnitude of t...
A test was conducted to determine the radiation level of several scram shaft assemblies after their ...
The radiation survey of the Blanket Exit Water Instrumentation assemblies Core I, Seed 1 was perform...
Radiation levels were determined at all permanently installed monitored points in the disposal area....
The purpose of the survey was to determine the radiation level in the Turbine Generator Services Bui...
The results are presented of a survey of calculated gamma-ray levels at many points on the surface o...
A test was made to obtain a record of radiation contamination levels during core I seed 1 refueling ...
A study of the radiation leakage from the shield of the Virginia Polytechnic Institute UTR-10 reacto...
[[abstract]]After 37 years of operation with a total thermal output of 44,456,058 kW hr, the radiati...
The purpose of the survey was to determine the radiation levels in the 1 D Boiler Chamber during pla...
Analytical shielding work performed for the fast reactor program during the months of July and Augus...
A fuel-element assembly from the first loading of the OMRE was examined in detail after experiencing...
A test was performed to determine the radiation levels of the thermal barriers contained in the rod-...